Wednesday, July 15, 2020

SUBSCRIPTIONS

Moab, UT

82 F
Moab
More

    UDOT to conduct safety work near La Sal Jct.

    Featured Stories

    Tales of Trails: Savor spectacular views from thrilling Shafer Trail

    In the 1890s, Moab pioneer brothers Frank M. And John S. Shafer developed the route from what had been a Native American pathway connecting what is now Canyonlands National Park to the river below.

    At 99, Moab man is knighted by France

    “The French people will never forget his courage and devotion to the great cause of freedom,”

    Leaving Guatemala, Part 4: ‘A year in the land of eternal spring’

    Though I planned to return someday, whether as a Peace Corps volunteer or not, this experience proved that even the best-laid plans go awry.

    Leaving Guatemala, Part 3: Sudden departure came with painful goodbyes

    Men donned wooden masks and numerous layers of sweatshirts and ponchos then proceeded to hit each other with whips as they danced around the town square.

    Leaving Guatemala Part 2: There wasn’t enough time to say goodbye

    To say I woke up on the Monday morning of the evacuation...
    Submitted
    Submitted
    Public submissions to The Times-Independent can range from press releases to obituaries to feature stories and news. All submissions are subject to editorial review and approval.

    The Utah Department of Transportation will begin a two-mile safety improvement project on U.S. Highway 191 as early as Monday, Aug. 19 between La Sal Junction and Hole-‘N’-The-Rock that will require regular road closures to accommodate blasting.

    The project aims to improve recovery for vehicles that wander from the travel lanes, by excavating into existing rock cuts and upgrading barriers to new standards or removing barriers where slopes can be leveled.

    Full road closures of up to 45 minutes may occur Monday through Thursday before 8:30 a.m. and after 6 p.m. to protect the safety of both workers and travelers, UDOT officials said in a press release. Single lane closures with alternating traffic and delays of up to 20 minutes may be anticipated at other times.

    Share this!

    - Advertisement -

    Latest News

    County: Mask mandate is official

    Southeast Utah Health Department Director Bradon Bradford modeled the local order after those in Salt Lake and Summit counties.

    Lionsback Resort project begins on Sand Flats Road

    The City of Moab will have oversight of the project, which was not something that was always on the table because state law allows SITLA to develop projects without input from local authorities.

    Drought conditions grip Utah; stats are grim

    It’s unlikely things will improve this late in the water year.

    State provides 75,000 more facemasks for Moab businesses, visitors

    Local businesses may pick up free face coverings at the Canyonlands Copy Center, 375 S. Main St., in Moab.

    County approves letter opposing September gas lease sales

    The oppositional letter asserts that the lease sale “threatens the core of our tourism economy by locking in long-term oil and gas leases on and around popular recreation areas that are vital to our local economy.”